LV/HV Switchgear for Shengsi Offshore Wind Farm Control Center
Background A 500MW offshore wind farm in East China Sea confronted triple challenges: 1.Extreme Salt Corrosion: Control center 300m from coast, salt deposition 18mg/m³(3× IEC 60721-3-4
Background A 500MW offshore wind farm in East China Sea confronted triple challenges: 1.Extreme Salt Corrosion: Control center 300m from coast, salt deposition 18mg/m³(3× IEC 60721-3-4
Overview: Dual Constraints of Policy & Environment Located in the Yellow River intertidal zone, the 200MW fishery-PV project faced dual binds: Equipment footprint capped at 3% of
Background Located at the edge of Kubuqi Desert, this 100MW solar plant faced triple extreme conditions: sandstorms (dust deposition >200g/m²), 70℃ diurnal temperature swing (-35℃~+45℃), and grid harmonics
Overview Xiashang Tianjin Ninghe Dongjituo 100MW Wind Farm, a key 2023 renewable project in Tianjin, operates 32×3.2MW turbines with annual output of 230 GWh. Located
Overview The George 1.58MW Distributed PV Project by Yangzhou Hengyun New Energy Co., Ltd. is a key subunit of the Phase I Public Utility Distributed
Advantage Analysis: The equipment has a small footprint and occupies minimal space, making it particularly suitable for areas with limited available land, especially in densely