LV/HV Switchgear for Shengsi Offshore Wind Farm Control Center
Background A 500MW offshore wind farm in East China Sea confronted triple challenges: 1.Extreme Salt Corrosion: Control center 300m from coast, salt deposition 18mg/m³(3× IEC 60721-3-4
Background A 500MW offshore wind farm in East China Sea confronted triple challenges: 1.Extreme Salt Corrosion: Control center 300m from coast, salt deposition 18mg/m³(3× IEC 60721-3-4
Overview: Dual Constraints of Policy & Environment Located in the Yellow River intertidal zone, the 200MW fishery-PV project faced dual binds: Equipment footprint capped at 3% of
Background Located at the edge of Kubuqi Desert, this 100MW solar plant faced triple extreme conditions: sandstorms (dust deposition >200g/m²), 70℃ diurnal temperature swing (-35℃~+45℃), and grid harmonics
Background East China’s largest frozen food base (240kt/year) faced triple challenges: Corrosion: Frequent acid/alkali washing (humidity >90%, salt fog C5 per IEC 60721-3-5); Load Surge: Freezer line
Overview Wugang Resettlement Community (420,000㎡, 3,200 households) is a key livelihood project in Wuhan. Its power system required compliance with GB 50053-2013 for reliability and
Overview Xiashang Tianjin Ninghe Dongjituo 100MW Wind Farm, a key 2023 renewable project in Tianjin, operates 32×3.2MW turbines with annual output of 230 GWh. Located
Overview: The 33kV GIS substation downstream of Princeton Data Center (Malaysia’s first Uptime Tier III-certified facility) serves as the critical power hub guaranteeing 99.999% operational
Background This 320m supertall commercial complex in Lujiazui required eco-friendly switchgear under extreme space constraints (2.8m ceiling height in B3 substation), LEED Platinum certification (zero GHG emissions), and EV charger
Background As the core of the Philippines’ North-South Transport Corridor, the 12.4km Taburos Tunnel (longest in SEA) required a power network covering 36 worksites, 7 TBMs, and 23
Project Background & Challenges Mission-Critical Objective: Construct a 220/35kV primary substation for PDG Data Center (48MW total capacity) in Kuala Lumpur, compliant with ANSI/TIA-942-B Tier IV – the