Overview
Xiashang Tianjin Ninghe Dongjituo 100MW Wind Farm, a key 2023 renewable project in Tianjin, operates 32×3.2MW turbines with annual output of 230 GWh. Located in Bohai Bay’s salt-fog zone (C4 corrosivity) and winter lows of -25°C, it complied with NB/T 10688-2021 for prefab substations. SH Power, as the sole enclosure supplier, delivered 35kV switchgear (incoming/collector cabinets) and prefabricated cabins, enabling full-capacity grid connection in June 2024—setting Tianjin’s record for fastest construction (11 months).
Core Solutions
Product Category | Model/Specs | Technology Highlights | Application Scenario |
35kV Collector Cabinet | KYN61-40.5 1250A/31.5kA | ・Fully insulated 40.5kV, 31.5kA breaking capacity (turbine fault current) | 6 collector lines protection |
Prefabricated Cabins | Switchgear cabin + Control cabin (12m×3m×3m) | ・Triple sealing (IP54 shell + positive pressure + isolated compartments) | Outdoor unmanned substation |
LV Distribution System | Incoming (2000A) + Feeder (630A) | ・Dual bus redundancy (transfer ≤0.2s) | 0.4kV station service power |
Safety Accessories | Stair handrails (304 stainless) | ・Anti-slip texture (friction ≥0.5) | Maintenance access for cabins |