The Wuhai Energy Hainan District 100MW Photovoltaic Power Station Project is a large-scale clean energy initiative developed on idle mining land, aligning with the national “Dual Carbon” strategy. SH Power, as the winning bidder for this project, undertook the EPC turnkey contracting responsibilities, covering design, procurement, and construction.
SH Power’s Solution & Engineering Services
For this project, leveraging its extensive experience in the power equipment and systems engineering sector, SH Power provided comprehensive EPC services:
Design & Optimization: Led the completion of the project’s overall technical and construction drawing design. Conducted targeted layout planning for the complex terrain, optimizing the tilt angles of the PV arrays and cable routing to enhance overall system efficiency.
Equipment Integration & Procurement: Managed the selection, technical specification development, and centralized procurement of key equipment. This fully utilized the company’s integration capabilities within the power industry supply chain to ensure equipment quality and control project costs.
- Construction & Management: Executed and managed all on-site civil works, bracket installation, module placement, electrical installation, and commissioning. Overcame on-site construction challenges through strict schedule, safety, and quality management, ensuring the project’s successful grid connection.
Looking Ahead
SH Power looks forward to applying the valuable experience gained from such large-scale ground-mounted PV EPC projects to more new energy power generation, energy storage, and smart microgrid initiatives. The company is committed to becoming a trusted engineering partner in the global transition towards cleaner and smarter energy structures.