Overview
The George 1.58MW Distributed PV Project by Yangzhou Hengyun New Energy Co., Ltd. is a key subunit of the Phase I Public Utility Distributed PV Project in Yangzhou Economic Development Zone. Utilizing rooftops of 13 public facilities (e.g., government buildings, schools) and parking lots, it deploys ~2,872 units of 550Wp monocrystalline modules (calculated ratio from total 3,670 modules for 2.0185MW). Operating under “self-consumption with grid feed-in” mode, it generates ~1.487 GWh/year, saving 535 tons of coal and reducing CO₂ by 1,482 tons annually2. Our company supplied the core grid-connection cabinets (GF1-3 & GF4 series), ensuring efficient and safe grid integration.
As a key equipment supplier for the project, SH Power provides the following products and services:
Product | Model | Technical Highlights | Application Scenario |
PV Grid Cabinet | GF1-3 | ・Rated current 630A, IP54 protection | Grid connection points for rooftop arrays (13 facilities) |
Smart Hub Cabinet | GF4 | ・Dual MPPT input, max efficiency 98.5% | Main grid hub for parking lot plant |