Wugang Resettlement Community (420,000㎡, 3,200 households) is a key livelihood project in Wuhan. Its power system required compliance with GB 50053-2013 for reliability and greenbelt integration (“Sponge City” mandate). Challenges included limited space (greening ratio ≥35%), noise control (night ≤45dB), and flood resistance (1,300mm annual rainfall). Our company supplied European-style compact substations (SCB13-315kVA for buildings & SCB13-8000kVA for main station), enabling full power-on before the 2024 flood season.
As a key equipment supplier for the project, SH Power provides the following products and services:
Product | Model/Specs | Technology Highlights | Application Scenario |
Compact Substation | SCB13-315kVA | ・No-load loss 0.27kW (China std. 0.48kW), sealed anti-condensation | Branch supply for 15 buildings (200 households/unit) |
Compact Substation | SCB13-8000kVA | ・Short-circuit impedance ≤6%, temp rise ≤55K (std. ≤65K) | Main community substation |