Overview
The 10kV Xintian Huacheng #1 Power Distribution Room Project (Shuzhou, Anhui) is State Grid Anhui’s first standardized dual-power supply demonstration for high-rise residential buildings (32 floors, 800 households). It required compliance with GB 50053-2013 for Grade-1 load reliability amid challenges: limited space (ceiling height 3.2m), ≤0.5s power switching, and cable trench leakage risks. Our company supplied 630A circuit breaker cabinets (main/backup switching), PT cabinets (voltage protection), and cable connection cabinets (compact busway), ensuring zero outages during 2024 flood season (daily rainfall >100mm).
As a key equipment supplier for the project, SH Power provides the following products and services:
Product | Model | Technical Highlights | Application Scenario |
630A Breaker Cabinet | SCB-630D | ・Dual-power auto-transfer (switching ≤0.3s) | Main/backup 10kV line switching |
PT Cabinet | VTM-10F | ・Wide-temp voltage monitoring (-25℃~70℃) | Real-time bus voltage protection |
Cable Connection Cabinet | CLC-10S | ・Fully shielded busbar (PD <10pC) | Compact cable distribution |