Côte d’Ivoire development and renovation project
1. Project Background & Critical Challenges Regional Profile: Network upgrade in industrial zones (Abidjan, San-Pédro) with 12% annual load growth (2020-2023), peak current >2,000A. Lines
1. Project Background & Critical Challenges Regional Profile: Network upgrade in industrial zones (Abidjan, San-Pédro) with 12% annual load growth (2020-2023), peak current >2,000A. Lines
Background East China’s largest frozen food base (240kt/year) faced triple challenges: Corrosion: Frequent acid/alkali washing (humidity >90%, salt fog C5 per IEC 60721-3-5); Load Surge: Freezer line
Background As the core of the Philippines’ North-South Transport Corridor, the 12.4km Taburos Tunnel (longest in SEA) required a power network covering 36 worksites, 7 TBMs, and 23
1. Project Overview Project Location: Nanjing, Jiangsu Province. Project Scale: The commercial area is about 30,000 square meters, covering a variety of business formats such