220KV,500KV Line fittings for PFISTERER SEFAG AG, Switzerland
Century-old PFISTERER leads Alpine grid modernization. For over a decade, SH Power has been a strategic partner: we run a CE/SEV-certified hub in Zurich and
Century-old PFISTERER leads Alpine grid modernization. For over a decade, SH Power has been a strategic partner: we run a CE/SEV-certified hub in Zurich and
As Europe’s wind power connection leader, RlBE dominates 80% of North Sea grid integration. Amid Europe’s energy transition, SH Power—its exclusive Asian OEM partner—established dedicated
Background East China’s largest frozen food hub faced triple challenges: 1.Extreme Corrosion: 4x daily acid/alkali wash(humidity>95% + pH 2-12, beyond IEC 60721-3-5 CLASS 5M3) Traditional
Background A 500MW offshore wind farm in East China Sea confronted triple challenges: 1.Extreme Salt Corrosion: Control center 300m from coast, salt deposition 18mg/m³(3× IEC 60721-3-4
Overview: Dual Constraints of Policy & Environment Located in the Yellow River intertidal zone, the 200MW fishery-PV project faced dual binds: Equipment footprint capped at 3% of
Background Located at the edge of Kubuqi Desert, this 100MW solar plant faced triple extreme conditions: sandstorms (dust deposition >200g/m²), 70℃ diurnal temperature swing (-35℃~+45℃), and grid harmonics
When typhoon struck a coastal substation, neighboring towers using our DC-185-50 anti-galloping deadend clamp survived 130km/h winds – thanks to precision residual stress control. I. The Physics
Scenario story The Morning After the Storm,John gasped—a rusted bolt snapped on the transmission tower, blacking out the entire line. Crew leader Tom held a
Background East China’s largest frozen food base (240kt/year) faced triple challenges: Corrosion: Frequent acid/alkali washing (humidity >90%, salt fog C5 per IEC 60721-3-5); Load Surge: Freezer line